A remedial solution should be both certain and final. The ability to achieve performance-based goals is a testament to the reliability and predictability of our thermal technologies. Guaranteed fixed price contracts are available for most applications, and unlike other technologies, the application of thermal remediation eliminates "rebound" of contaminants. There is no place to hide: thermal remediation removes organic contaminants from a diverse series of lithologies, including clays, silts, sands, sandstone, and fractured rock - both below and above groundwater.
Thermal remediation treatment times generally range between 8 to 32 weeks, after which residential target levels may be achieved in both ground water and soil. The exact duration of treatment time will depend on multiple factors, such as contaminant types treated, target temperatures, hydrology, and well spacing. A successful project begins with a proper design, and GEO completes a full numerical simulation and three dimensional thermal model for every project before implementation, guaranteeing a fast track to site closure.
No excavation, no dump trucks, no shoring, and no dust are necessary. Projects have been successfully implemented beneath businesses, railroad tracks, buildings, apartments, and even homes. Subgrade completion of GTR™ wells is possible in active facilities.
The total cleanup costs with GTR™ are extremely competitive, especially when considering:
Nearly all organic contaminants (and even a few inorganic contaminants) are suitable for GTR™ treatment. The technology works effectively in all soil types as conductive heat progresses quasi-homogeneously throughout the different lithologies.
GTR™ is a very sustainable option compared to more traditional alternatives: