LinkedIn Facebook Twitter Google+ Instagram YouTube YouTube

C3 Technology

California, United States | 2002


Pollution

Contaminant

CFC-12
CFC-113
PCE
TCE
1,1,1 TCA
1,1 DCA
1,1 DCE
cis-1,2 DCE

Click Here to Download the Case Study

Chlorofluorocarbon (CFC) Remediation

Project Description

The project site is located in Northern California and was leased and operated as a chemical storage and solvent recovery operation from late 1972 through April 1993. During an earlier period, the site may also have been used as a waste transfer station. Previous investigations indicate that soil and groundwater at the site, and groundwater down-gradient (westward) from the site, have been impacted by halogenated solvents and chlorofluorocarbons (CFCs).

Site Geology

Based on soil boring logs, shallow site stratigraphy consists of the following units:

Vapor Treatment System Design

Performance and Results

Using a GEO refrigerated condensation unit for soil vapor extraction, 4,680 pounds of chlorinated solvents were recovered in 30 months.

graph