C3 Technology

Minnesota, United States | Spring 2013

Client:
MPCA

Consultant:
DCI Environmental

Neighborhood:
Suburb

Pollution

Contaminant

Petroleum Hydrocarbons
Chlorinated Compound
Other Organics
Chlorinated Solvents

Max Concentration

NAPL/ free product

Context

Geology

Mixed Fill and Silts

Volume

2,500-10,000

Tons

> 10,000

Specificities

LNAPL Present
Source Zone Treatment
Classified or Hazardous Site
Private Site Requiring Extreme Discretion
DNAPL Present

Click Here to Download the Case Study
Missassauga Site Photo

Andover

Condensation of Vapors to Remove Mass During Soil Vapor Extraction: C3 Technology Tackles Mixed Chlorinated Solvents at a Hazardous Waste Pit

Vapor Extraction and Refrigerated Condensation was used as a primary source removal technology to remediate high concentrations of recalcitrant chlorinated solvent compounds at the WDE Site in Minnesota. The use of Refrigerated Condensation has achieved high mass removal rates and will reduce the lifecycle costs and time of remediation.

History

6,600 drums of hazardous wastes were placed in a 0.2-acre asphalt-lined pit between November 1972 and January 1974. Soil and ground water beneath the pit in the upper sand aquifer was highly contaminated. Contaminants included various chlorinated solvents, benzene, and toluene. In 2007, methane power generation operations commenced, but were quickly suspended after vapors from chlorinated VOCs ingested by the system prevented reliable operations.

Volatile organic compound (VOC) constituents at the site consisted of 1,1-dichloroethane, 1,2-dichloroethane, cis 1,2-dichloroethylene, 1,1,1-trichloroethane, 1,1,2-trichloroethylene, 1,1-dichloroethylene,benzene, ethyl benzene, tetrahydrofuran, vynl chloride, toluene, and 1,1,2-trichloroethane.

Initial SVE testing indicated that thermal oxidation and granular activated carbon treatment would both be cost prohibitive and technically unreliable. The Minnesota Pollution Control Authority (MPCA) looked for a more innovative solution.

Pilot Study

In October 2009, the MPCA selected a soil vapor extraction (SVE) system utilizing cryogenic-cooling and compression process (C3 Technology) for site trials, and the system was installed for pilot testing at the site. In April 2010, modifications were made to increase the treatment capacity of the SVE system from 100 scfm to 200 scfm capacity.

During pilot testing, the SVE system has recovered over 40,000 pounds of mixed chlorinated solvents in the form of non-aqueous phase liquid (NAPL). Some NAPL was collected and sent offsite for use in fuel blending (recycling), while other condensate was sent offsite for disposal.

Full Scale Implementation

Design and construction of a permanent 200 scfm condensation-based SVE system began in December 2012, and was installed in January 2013. During the month of February 2013, the system achieved 100% runtime while recovering an average condensate volume of 40 gallons per day.

Based on these pilot and full-scale results, the use of thermally-enhanced soil vapor extraction in combination with condensation off-gas treatment is being explored at additional hazardous waste sites in the State of Minnesota.